Nonlinear Project

My Parameters are as follows:

QR-4 Input Time of day (hour)

17.5

QR-6 Target Outdoor Temperature:

56.0

ER-4 Input Elapsed Time (minutes)

138

ER-5 Target Coffee Temperature

 

102

 

These must be used in the project. The description is attached below.