Assignment 1: Discussion Question District 4 Move Project

Assignment 1: Discussion Question  

Important note: The discussion questions and assignments in this course are linked to one single case study. It is recommended that you read the case study, inDoc Sharing, before attempting any assignment or discussion question.

By Saturday, November 30, 2013, respond to the discussion question. Submit your responses to the appropriate Discussion Area. Start reviewing and responding to your classmates as early in the week as possible.

Discussion Rubric

 

 

                                                 Discussion Question

Project communication is one of the most important factors in project management. A project manager will spend most of his/her time on communications.

Discuss who the project stakeholders on District 4 Move project are.

Discuss various types of communications you will need to use on the project, what stakeholder(s) each type would address and the frequency of each communication type. You may choose to use a table for this information.

Justify your responses.

Project communication is one of the most important factors in project management. A project manager will spend most of his/her time on communications.

Discuss who the project stakeholders on District 4 Move project are.

Discuss various types of communications you will need to use on the project, what stakeholder(s) each type would address and the frequency of each communication type. You may choose to use a table for this information.

Justify your responses.

Project communication is one of the most important factors in project management. A project manager will spend most of his/her time on communications.

Discuss who the project stakeholders on District 4 Move project are.

Discuss various types of communications you will need to use on the project, what stakeholder(s) each type would address and the frequency of each communication type. You may choose to use a table for this information.

Justify your responses.

  • District 4 move project
  •  
  • 1. Home must meet local building codes.
  • 2. All windows and doors must pass NFRC class 40 energy ratings.
  • 3. Exterior wall insulation must meet an “R” factor of 21.
  • 4. Ceiling insulation must meet an “R” factor of 38.
  • 5. Floor insulation must meet an “R” factor of 25.
  • 6. Garage will accommodate two large-size cars and one 20-foot Winnebago.
  • 7. Structure must pass seismic stability codes.

LIMITS AND EXCLUSIONS

  • 1. The home will be built to the specifications and design of the original blueprints provided by the customer.
  • 2. Owner responsible for landscaping.
  • 3. Refrigerator is not included among kitchen appliances.
  • 4. Air conditioning is not included but prewiring is included.
  • 5. Contractor reserves the right to contract out services.
  • 6. Contractor responsible for subcontracted work.
  • 7. Site work limited to Monday through Friday, 8:00 A.M. to 6:00 P.M.